2,300+ projects
Tracked across all 50 states with verified updates. See the data on a live walkthrough.
How US data centers get built
Analysis of the pipeline, the states gaining share and the companies behind it.
Interactive map of 2,300+ upcoming data center projects across the United States. Color every state by project count, planned capacity or investment, filter by development stage, and click a state to see its full pipeline. Updated November 16, 2026.
Zoom in to switch to satellite
Dots are representative: each dot stands for one project (or 100 MW / $2B on the Capacity and Investment views), placed at random within its state. The exact site location (latitude and longitude) of every project is available in our database.
Want the projects behind the map? The US Data Center Project Tracker lists every project with owner, MW, capex, stage, timeline and verified contacts.
Open the Project TrackerEvery state with upcoming data center projects, ranked by planned capacity. Click a column to re-sort, or a row to find the state on the map. Each state links to its own page with the latest projects and news.
| Texas | 439 | 65.6 GW | $1.19T | 18.3% |
| Utah | 28 | 32.1 GW | $114B | 1.2% |
| Virginia | 303 | 17.3 GW | $528.6B | 12.6% |
| Pennsylvania | 196 | 14.7 GW | $394.4B | 8.2% |
| Louisiana | 21 | 10.8 GW | $210.6B | 0.9% |
| New Mexico | 13 | 10.8 GW | $125.5B | 0.5% |
| Georgia | 180 | 9.4 GW | $316.3B | 7.5% |
| Kentucky | 40 | 9.2 GW | $146.6B | 1.7% |
| Ohio | 89 | 8.3 GW | $635.9B | 3.7% |
| Arizona | 113 | 7.3 GW | $181.6B | 4.7% |
| Michigan | 28 | 6.6 GW | $105.8B | 1.2% |
| Indiana | 58 | 5.5 GW | $259.7B | 2.4% |
| North Carolina | 54 | 3.8 GW | $85.4B | 2.3% |
| Illinois | 154 | 3.7 GW | $268.6B | 6.4% |
| Oklahoma | 37 | 3.7 GW | $95.7B | 1.5% |
| California | 65 | 3.2 GW | $61.7B | 2.7% |
| West Virginia | 12 | 3.2 GW | $92.2B | 0.5% |
| Kansas | 36 | 3.2 GW | $112.8B | 1.5% |
| South Carolina | 21 | 2.9 GW | $33.7B | 0.9% |
| New York | 36 | 2.5 GW | $74.4B | 1.5% |
| Iowa | 48 | 2.3 GW | $88.5B | 2.0% |
| North Dakota | 15 | 2.2 GW | $36.3B | 0.6% |
| Maryland | 15 | 2.1 GW | $21.4B | 0.6% |
| Florida | 31 | 1.9 GW | $25.7B | 1.3% |
| Missouri | 26 | 1.8 GW | $96.4B | 1.1% |
| Delaware | 5 | 1.8 GW | $16.9B | 0.2% |
| Colorado | 20 | 1.8 GW | $47.9B | 0.8% |
| Nebraska | 4 | 1.7 GW | $18.1B | 0.2% |
| Connecticut | 34 | 1.7 GW | $10.6B | 1.4% |
| Nevada | 28 | 1.6 GW | $109.9B | 1.2% |
| Wyoming | 14 | 1.5 GW | $85B | 0.6% |
| Alabama | 27 | 1.3 GW | $62.4B | 1.1% |
| Oregon | 35 | 1.3 GW | $55.4B | 1.5% |
| Arkansas | 21 | 1.2 GW | $62.4B | 0.9% |
| Wisconsin | 15 | 1.1 GW | $40.1B | 0.6% |
| Minnesota | 19 | 987 MW | $28.4B | 0.8% |
| Mississippi | 19 | 616 MW | $62B | 0.8% |
| South Dakota | 2 | 550 MW | $5.6B | 0.1% |
| Tennessee | 16 | 380 MW | $13.4B | 0.7% |
| New Jersey | 6 | 360 MW | $8.2B | 0.3% |
| Washington | 24 | 18 MW | $49.3B | 1.0% |
| Maine | 5 | 15 MW | $2.1B | 0.2% |
| Idaho | 17 | 13 MW | $9.6B | 0.7% |
| Hawaii | 2 | 2 MW | $120M | 0.1% |
| Massachusetts | 9 | - | $23B | 0.4% |
| Alaska | 5 | - | $3.7B | 0.2% |
| Montana | 3 | - | $7.7B | 0.1% |
| New Hampshire | 1 | - | $20M | 0.0% |
| Rhode Island | 1 | - | $450M | 0.0% |
| virginia | 1 | - | $13.2B | 0.0% |
Projects counts upcoming facilities, Capacity sums planned megawatts and Investment sums announced capital expenditure.
Each small dot is one upcoming project (or 100 MW / $2B on the Capacity and Investment views), coloured by stage and placed at random within its state; the exact site of every project is in our database. Large blue dots are tracked sites: zoom in and the latest satellite picture of that area blends into the map. The Industry activity button swaps the project dots for news: one pulsing dot per story, with filters for the last 24 hours, 7 days, 30 days or all time.
The stage filter splits the pipeline by how close projects are to power-on: early stage (study, announced, planning), design, procurement (bids and contract award) and construction (pre-construction and on site).
Figures come from Blackridge Research's project database, built from permit filings, regulatory disclosures, utility filings and developer announcements. For project-level detail, owners and contacts, use the data center project tracker, or browse the data center companies behind the pipeline.
Texas currently leads on project count, planned capacity and investment, followed by hubs such as Virginia, Georgia and Pennsylvania. Switch the map between Projects, Capacity and Investment to see the live ranking.
We currently track 2,300+ upcoming data center projects across the United States, from early planning through active construction.
Blackridge Research tracks each project against primary sources: county permits, planning commission agendas, utility interconnection filings and company announcements. The map updates daily.
Click a state for its summary and stage breakdown, then open its state page. The full list with owners, MW, capex and contacts is in the US Data Center Project Tracker.