Panattoni Pitches 300 MW Data Center Development Near Dayton Airport in Union City, Ohio
Representatives of Panattoni Data Centers presented a preliminary plan to the Union City Council Monday night for a four-building data center campus that would deliver roughly 300 megawatts of electrical capacity on land just north of the Dayton Airport.
Project Flyer
The proposal, identified as "Project Flyer," would occupy about 201 acres along Montgomery County Line Road between Peters and Dog Leg Roads.
The announcement drew an unusually large crowd, with more than 50 people filling the meeting room and another 50 or more waiting outside in the cold. The session was streamed live on YouTube, and a recording remains available on the City of Union's channel.
The council, led by Mayor Michael O'Callaghan and Vice Mayor John Bruns, also includes members Robert Bennett, Linda Black, Stephen Brookover, Josh Rarick, and Lynne Thomas-Roth.
Scale and Layout of the Campus
According to Panattoni's presentation and its project website, the campus would consist of four data center buildings, three at 320,000 square feet and one at 288,000 square feet, along with a single administrative building.
The developer expects the campus to be built in phases. No rezoning will be necessary because the land is already zoned L1 light industrial, a designation that permits data centers, according to the developer.
A conceptual aerial rendering displayed at the meeting, which was labeled "for illustrative purposes only," shows the campus situated among farm fields adjacent to an existing electrical substation.
The city has been negotiating with Panattoni for some time, though officials have not disclosed for how long.
Utilities and Neighborhood Mitigation
Panattoni states on its project website that it will pay 100% of the costs of all power, substations, and other infrastructure the campus requires, which the company says ensures Ohio families' electric rates will not rise because of the development.
The company says sufficient water and sewer capacity exists to serve the campus and that it will fund any infrastructure extensions.
On water use, Panattoni says it is working with the city to evaluate the use of treated, recycled water from the local water treatment facility.
To limit effects on nearby properties, the company says it will plan building placement, setbacks, landscaping, lighting, screening, and sound-reduction measures, and its construction plans will address traffic and site activity during each phase.
Employment and Fiscal Effects
The company says construction of the campus will require electrical, mechanical, civil, and general construction trades.
Additional details about jobs and tax impacts were presented at the council meeting, and the developer has indicated that interested subcontractors can obtain more information at an upcoming open house.
Open House Set for Nov. 30
Residents will be able to question project representatives directly next week. Panattoni will host an informational open house from 5 to 9 p.m. on Monday, Nov. 30, at 201 W. Martindale Road in Union, with project team members meeting one-on-one with interested residents.
There will be no formal presentation.
Residents, subcontractors, and scholarship applicants may stop in at any time to visit tables and review materials. The project website includes FAQs, updates, and a form for submitting questions and comments.
Union Plan Compared With Other Ohio Projects
At 300 megawatts on roughly 200 acres, the Union proposal would be considerably smaller than two other data center projects recently proposed in Ohio.
In Piqua, developer J5 LLC, doing business as Shaytura LLC, has requested about 1,400 megawatts for a campus on roughly 608 acres at Farrington and Washington roads, with Meta reported as the operator, nearly five times the size of the Union project.
In Pike County, SB Energy, a SoftBank subsidiary, plans the PORTS-Pike Technology Campus at 10 gigawatts, or 10,000 megawatts, with OpenAI as the tenant, on fewer than 500 acres of private land in its current permit application. That planned capacity is more than 30 times Union's size.
The proposal is the latest in a string of data center announcements across Ohio, as developers continue to pursue sites offering available land, existing electrical infrastructure, and industrial zoning in the Miami Valley region and beyond.
The Nov. 30 open house will give Union residents their first opportunity to speak directly with project representatives about the plan.